Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 84 results ...

Adibfar, A (2020) Bridge digital twins: Fusion of intelligent transportation systems (ITS) sensor data and bridge information modeling (BRIM) for interoperability, Unpublished PhD Thesis, , University of Florida.

Agdas, D (2008) Corporate-level management system for critical strategic resources for large construction program managers, Unpublished PhD Thesis, , University of Florida.

Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects, Unpublished PhD Thesis, , University of Florida.

Alkhard, A (2016) Analysis of influencing factors on safety culture in the construction industry of Saudi Arabia, Unpublished PhD Thesis, , University of Florida.

Anglade, Y J (1998) Development of methodology for highway agencies to follow in establishing optimum acceptance plans for pavements, Unpublished PhD Thesis, , University of Florida.

Bentil, K K (1990) A model approach for predicting commercial construction site accidents, Unpublished PhD Thesis, , University of Florida.

Chen, H-L (2002) Development of a systematic integration approach for multi-level cost flow prediction and management, Unpublished PhD Thesis, , University of Florida.

Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation, Unpublished PhD Thesis, , University of Florida.

Chung, J H (2015) Optimizing financial structure of transportation public-private partnership infrastructure projects based on traffic revenue risks: Case study of US DBFOM project, Unpublished PhD Thesis, , University of Florida.

Cochran, K M (2006) Construction and demolition debris recycling: Methods, markets, and policy, Unpublished PhD Thesis, , University of Florida.

Coffey, M A (2010) An optimization model for subsurface utility engineering during the design process, Unpublished PhD Thesis, , University of Florida.

Cosma, C (2003) Development of a systematic approach for uncertainty assessment in scheduling multiple repetitive construction processes by using fuzzy set theory, Unpublished PhD Thesis, , University of Florida.

Danso-Amoako, M O (2006) Developing a framework to support data exchange from heterogeneous data sources via industry foundation classes (IFC) and web services, Unpublished PhD Thesis, , University of Florida.

Dib, H Y (2006) Visual information access and management for life cycle project management, Unpublished PhD Thesis, , University of Florida.

Duvel, C S (1999) Establishing rule-based models to implement workflow within construction organizations, Unpublished PhD Thesis, , University of Florida.

El-Assaly, A E E-D (1997) Development of a statistical/mechanistic model to predict the consumption of nonrenewable materials in highway construction programs, Unpublished PhD Thesis, , University of Florida.

El-Mashaleh, M S (2003) Firm performance and information technology utilization in the construction industry: An empirical study, Unpublished PhD Thesis, , University of Florida.

Elias, A M (1998) Development of a systematic approach for the inclusion of accident risk factors in the calculation of road user costs for construction zones, Unpublished PhD Thesis, , University of Florida.

Elliott, B R (2000) Investigation of the construction scheduling communication process: Problems, foreman's role, means of improvement and use of information technology, Unpublished PhD Thesis, , University of Florida.

Ellis, R D, Jr. (1989) Model for prediction of highway construction production rates, Unpublished PhD Thesis, , University of Florida.

Emmer, M J (2009) A decision process model for closing the structural steel materials loop in construction, Unpublished PhD Thesis, , University of Florida.

Epstein, W C (1995) Development of a systematic approach for knowledge acquisition and experience capture of veteran practitioners in the highway construction industry, Unpublished PhD Thesis, , University of Florida.

Fetterhoff, O G, III (2004) Comparative evaluation of strategic construction-market forecasting methodologies, Unpublished PhD Thesis, , University of Florida.

Forcael, E (2010) Buffering strategies for managing transportation construction projects, Unpublished PhD Thesis, , University of Florida.

Godfrey, R J (2007) Analysis of construction worker injury information from a workers' compensation database, Unpublished PhD Thesis, , University of Florida.

Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects, Unpublished PhD Thesis, , University of Florida.

Guo, K (2006) Risk of pavement warranties to contractors, Unpublished PhD Thesis, , University of Florida.

Haidar, A (2011) Analysis and optimization of megaproject performance, Unpublished PhD Thesis, , University of Florida.

Harris, M A (2007) Developing a scorecard to evaluate the use of personal fall arrest systems, Unpublished PhD Thesis, , University of Florida.

Haupt, T C (2001) The performance approach to construction worker safety and health, Unpublished PhD Thesis, , University of Florida.

Holtzhower, D L (2015) Decision model to optimize wastewater treatment in the built environment, Unpublished PhD Thesis, , University of Florida.

Jiang, A (2005) A decision support model for cost and activity-based performance measurement in steel construction, Unpublished PhD Thesis, , University of Florida.

Jorge, J (1990) Model of uniform cost policies and procedures for the establishment of construction equipment rates, Unpublished PhD Thesis, , University of Florida.

Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm, Unpublished PhD Thesis, , University of Florida.

Kim, S J (2009) Identification of construction project problems and their impacts on project success, Unpublished PhD Thesis, , University of Florida.

Kumar, A (1994) Development of a model for determining workzone illumination requirements during nighttime highway construction, Unpublished PhD Thesis, , University of Florida.

Languell, J L (2001) Development of a prototype assessment tool to evaluate the potential to successfully implement deconstruction as a regional waste reduction strategy, Unpublished PhD Thesis, , University of Florida.

Lee, J (2008) Dynamic project management methodology: Managing schedule compression, Unpublished PhD Thesis, , University of Florida.

Lee, S-H (2003) A process model for controlling project productivity of highway construction operations, Unpublished PhD Thesis, , University of Florida.

Lertpaitoonpan, W (2000) Bridge damage detection using a system identification method, Unpublished PhD Thesis, , University of Florida.

Liu, W (2008) Systems theory based method for construction project planning, Unpublished PhD Thesis, , University of Florida.

Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida, Unpublished PhD Thesis, , University of Florida.

Lu, H (2002) Extended production integration for construction (epic): An integration system for building construction, Unpublished PhD Thesis, , University of Florida.

Malone, E K (2010) Work-life balance and organizational commitment of women in construction in the United States, Unpublished PhD Thesis, , University of Florida.

Mutis-Sin, I A (2007) Framework for interpretation of construction concept representations, Unpublished PhD Thesis, , University of Florida.

  • Type: Thesis
  • Keywords: complexity; efficiency; fragmentation; construction project; computing; interoperability; life cycle; mediation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304868793
  • Abstract:
    Construction actors have the ability to operate regularly and concurrently on ongoing activities with other actors, or to interoperate, during the project life cycle. They socially interoperate according to particular situations and project needs, once they have identified their needs for interacting with others by manipulating or computing the information. The elements or products of the interoperations have the quality of information. Actors interoperate through the exchanging, sharing, transferring, or integrating of information. However, actors on construction projects experience interoperability problems that increase the use of resources, raise projects costs, and intensify the complexity of the project. As a consequence of these interoperability problems, the construction industry has concentrated its efforts on finding new methods for exchanging, sharing, transferring, and integrating information. These efforts advocate that interoperability is possible through the use of logical models to share common domain concepts in a conceptual model. Logical models have an advantage based on the efficiency in accessing the model. These efforts fail to derive a common model due to the significant fragmentation of the domain, the multiple views of the participant's, and the combinatorial explosion that is achieved when one attempts to define the relationships among construction concepts. Our research develops a systematic approach that aids construction participants in identifying the potential inconsistencies of the information within the interoperation. This strategy facilitates the construction project actors in the acknowledgement of their misconceptions concerning the observed information. The strategy establishes a framework for reducing errors produced from the assertions or conclusions about the observed pieces of information. This framework addresses the need of a mediation mechanism in interoperability. The framework brings the necessary elements to interpret the information supplied from other participants in a project. The mediation mechanism reacts as a source of verification of the construction concepts employed in the interoperability activities. Our strategy focuses on a semantic interoperability step, which is the understanding of the information representations generated from different parties. The research scrutinizes the interpretation of the representations performed by an actor as a cognitive agent, by searching for the understanding of the fundamental elements involved within the actions of interpretation. The purpose is to bring into existence a strategy that aids the actors in reducing the time, the resources, and the errors generated during their interpretation operations.

Niu, J (2014) Ontology-based semantic interpretation framework for legal analysis of construction claims, Unpublished PhD Thesis, , University of Florida.

Nwodo, M N (2020) Investigation of exergy-based life cycle assessment of buildings, Unpublished PhD Thesis, , University of Florida.

Ohland, M W (1996) Engineering by design: A methodology for designing creative engineering activities, Unpublished PhD Thesis, , University of Florida.

Pesantes-Tavares, E R (2011) Construction worker health: A web-based approach to selecting alternatives to hazardous procedures, Unpublished PhD Thesis, , University of Florida.

Pyeon, J-H (2005) Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance, Unpublished PhD Thesis, , University of Florida.

Qi, B (2021) BIM and ontological-based framework for design, manufacturing, and assembling requirements checking of prefabricated component, Unpublished PhD Thesis, , University of Florida.

Qu, T (2006) The usability of graphical user interfaces of mobile computing devices designed for construction foremen: Icons and pre-defined text lists compared, Unpublished PhD Thesis, , University of Florida.

Raheem, A A (2014) Developing a framework for a reciprocal safety implementation system (RSIS) in the pakistani construction industry, Unpublished PhD Thesis, , University of Florida.

Razkenari, M A (2019) Framework for measuring industrialized construction maturity, Unpublished PhD Thesis, , University of Florida.

Rodriguez Diaz, C R (2012) Development of a framework and a rating system tool, for sustainable infrastructure certification in developing countries, case study for Ecuador, Unpublished PhD Thesis, , University of Florida.

Rodriguez-Ramos, W E (1982) Quantitative techniques for construction site layout planning, Unpublished PhD Thesis, , University of Florida.

Schneider, R H (1981) Local construction regulatory process innovation: A comparative analysis of Florida building inspection departments, Unpublished PhD Thesis, , University of Florida.

Shanbari, H A (2016) Evaluating the use of video games in construction management education, Unpublished PhD Thesis, , University of Florida.

Shi, W (2009) Framework for integration of BIM and RFID in steel construction, Unpublished PhD Thesis, , University of Florida.

Shi, Y (2020) A working memory investigation of immersive visualization technologies on construction task performance, Unpublished PhD Thesis, , University of Florida.

Shojaei Kol Kachi, A (2017) Extending the portfolio and strategic planning horizon by the stochastic forecasting of unknown future projects: A FDOT case study, Unpublished PhD Thesis, , University of Florida.

Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective, Unpublished PhD Thesis, , University of Florida.

Smith, D J (2003) Ecological effects of roads: Theory, analysis, management, and planning considerations, Unpublished PhD Thesis, , University of Florida.

Soares, R (1999) User cost customization for a Florida bridge management system, Unpublished PhD Thesis, , University of Florida.

Stevens, M S (2012) Impact of key management practices on overhead to direct cost ratio for specialty construction contractors, Unpublished PhD Thesis, , University of Florida.

Suarez, J J (2004) A neural network model to predict business failure in construction companies, in the United States of America, Unpublished PhD Thesis, , University of Florida.

Suermann, P C (2009) Evaluating the impact of building information modeling (BIM) on construction, Unpublished PhD Thesis, , University of Florida.

Sun, W (2000) Designing an object-oriented geographic information system application for integration of building construction project information, Unpublished PhD Thesis, , University of Florida.

Terouhid, S A (2013) A dynamic decision support system for organizational sustainability excellence of construction firms, Unpublished PhD Thesis, , University of Florida.

Tian, Y (2022) Financing infrastructure through blockchain tokenization, Unpublished PhD Thesis, , University of Florida.

Vidalis, S M (2005) Relation between cost, quality, and risk in portland cement concrete pavement construction, Unpublished PhD Thesis, , University of Florida.

Wang, Y (2015) Structured versus direct-mapping approaches to empirical modeling of civil engineering problems, Unpublished PhD Thesis, , University of Florida.

Wao, J O (2014) Value engineering methodology to improve building sustainability outcomes, Unpublished PhD Thesis, , University of Florida.

Wehle, A J (2014) Taxonometric model for using leading safety indicators in the construction industry, Unpublished PhD Thesis, , University of Florida.

Westmoreland, G (1979) Electric utilities' accounting for construction work in progress the effects of alternative methods on the financial statements, utility rates and market to book ratio, Unpublished PhD Thesis, , University of Florida.

Wetherington, L E (1992) The effect of variations in management techniques on construction productivity, Unpublished PhD Thesis, , University of Florida.

Whiteman, D E (2002) The application of total quality management in construction field operations, Unpublished PhD Thesis, , University of Florida.

Xie, H (2005) User model-driven architecture for information retrieval in construction project management, Unpublished PhD Thesis, , University of Florida.

Zhang, L (2012) Ontology-based web services framework for building information modeling, Unpublished PhD Thesis, , University of Florida.

Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing, Unpublished PhD Thesis, , University of Florida.

Zhou, T (2023) Embodied robot teleoperation in construction, Unpublished PhD Thesis, , University of Florida.

Zhu, Q (2022) Haptic interaction for human-robot shared perception in construction, Unpublished PhD Thesis, , University of Florida.

Zhu, Y (1999) Web-based construction document processing through a "malleable frame", Unpublished PhD Thesis, School of Building Construction, University of Florida.

Zuppa, D (2009) Model for developing trust in construction management, Unpublished PhD Thesis, , University of Florida.